Mount Joy Borough New Municipal Building

1. PROJECT STATUS:
Active

2. PROJECT TYPE:
Municipal, Public Safety

3. PROJECT SIZE:
New Construction: 19,200 SF

4. SCOPE OF WORK:
The all-new building construction consists of load-bearing masonry, steel joists with metal deck, wood truss systems with both metal deck and plywood decking, masonry veneer, thin set stone veneer, exterior metal wall panel systems, EPDM membrane roofing, aluminum storefront window and wall systems, casework, and interior finishes along with the specified mechanical, electrical, plumbing and fire protection systems. The new facility is located within the Borough’s Grandview Park area, providing parking and support to the facility as well as community events held at the park.

5. ESTIMATED CONSTRUCTION COSTS:
General Construction: $4.8M
HVAC Construction: $940,000
Plumbing Construction: $420,000
Electrical Construction: $620,000
Total: $6.78M

Bid Advertisement Attachment