Secondary – Project List

Chambersburg Area Senior High School

Chambersburg Area Senior High School

The additions and renovations to the Chambersburg Area Senior High School will involve a comprehensive rehabilitation to the existing school with a 330,000 SF addition. The renovated facility will be expanded to accommodate 2,000 Students. The project allows for the renovation and expansion of existing performing arts center, a new competition gymnasium, cafeteria, kitchen, library…

Read More
Clarke County High School

Clarke County High School

Construction recently completed for the prototype design of the new state-of-the-art Clarke County High School. The organizational strategy of the floor plan features a wide linear student commons or “main street”, infused with an abundance of natural daylight. The main street bisects the building floor plan organizing the major assembly areas of the building together…

Read More
Connellsville Area Senior High School

Connellsville Area Senior High School

Crabtree, Rohrbaugh & Associates designed the additions and renovations to the former 10-12 Connellsville Area Senior High School. The school accommodates 1,450 students from grades 9th through 12th grades. The original building was constructed in 1970 and required a total renovation to replace mechanical, electrical, plumbing systems, interior finishes, windows and roof throughout the facility. In…

Read More
Dallas High School

Dallas High School

The new 1,200 student Dallas High School is located at the main campus of the Dallas School District.  The campus planning provided by Crabtree, Rohrbaugh & Associates completely changed vehicular circulation to relieve congestion and conflict with bus traffic and parents/students. The entire site was evaluated and improvements implemented to the site stormwater system to alleviate localized…

Read More
Donegal High School

Donegal High School

Crabtree, Rohrbaugh & Associates conducted a District Wide Facility Study for Donegal School District to evaluate conditions at several schools.  At the conclusion of the study , it was proposed to build a new high school to replace the current building. The New Donegal High School is a state of the art facility that addresses the…

Read More
Hazleton Area Academy of Sciences

Hazleton Area Academy of Sciences

The new Hazleton Area Academy of Sciences creates a new STEM educational model for the Hazleton Area School District to remove the traditional barriers erected between the four disciplines of Science, Technology, Engineering and Mathematics, by integrating the four subjects into one cohesive means of teaching and learning. The engineering component puts emphasis on the…

Read More
Lewisburg Area High School

Lewisburg Area High School

Crabtree, Rohrbaugh & Associates completed a detailed facility assessment of the old Lewisburg Area High School. After careful deliberation, the school board approved the construction of a new high school which was completed in time for the 2016-17 school year. The new school features flexible learning classrooms, six science labs, auditorium, band and choral rooms,…

Read More
Midd West High School

Midd West High School

Crabtree Rohrbaugh and Associates recently completed design for Additions and Renovations to Midd-West High School to accommodate 800 students.  The High School was designed to meet U.S. Green Building Council LEED Gold rating to maximize the school district’s long term capital investment while maintaining a cost effective budget and durable building materials. Over a 30…

Read More
Middletown Area High School

Middletown Area High School

Crabtree, Rohrbaugh & Associates and the Middletown Area School District have worked closely on several projects for more than 12 years. Completed in time for the 2016-17 school year, the new modern high school meet the district’s goals of integrating 21st educational programming for their students. The design features a Central Commons area with public…

Read More
North Pocono High School

North Pocono High School

Crabtree, Rohrbaugh & Associates was challenged by North Pocono School District to provide a design for the new high school that met the district’s budget. By implementing  our cost effective design solutions and closely monitoring the program spaces, Crabtree, Rohrbaugh & Associates were able to meet the tight budget.

Read More